Home › New Hampshire › Bedford
Plumbers in Bedford, NH
A Bedford home may get its water from Manchester Water Works, Pennichuck or its own well, and town sewer reaches only a district on the east side that drains to Manchester. Call (978) 788-2810 or send the form. We'll review your request and help you with the next step.
- Free for homeowners
- Credentials checked before referral
- Wells, septic and town sewer
Ask About Plumbing Service in Your Area
Tell us about the job. We'll review it and help you with the next step.
Please add your name, a 10-digit phone number and a valid email.
Sorry, we couldn't save your request just now. Please call (978) 788-2810 so it isn't lost.
We've received several requests from this connection in a short time. Please call (978) 788-2810 and we'll take it from there.
We couldn't finish the spam check. Wait a moment and send it again, or call (978) 788-2810.
Plumbing services in Bedford
What do you need in Bedford?

Water Heaters
Tank and tankless replacements, and heaters that leak or run out of hot water.

Drains & Sewer Lines
Slow or backed-up drains and the line from the house to the street or septic tank.

Leaks & Repiping
Leaking pipes, frozen-pipe damage and replacing old supply lines.

Kitchen & Bath Fixtures
Faucets, toilets, sinks, showers and tubs, replaced or added.

Sump Pumps
New and replacement pumps for basements that take on water.

Gas Lines for Appliances
Gas piping for ranges, dryers, heaters and generators.
Water, wells, sewer and septic
Two water utilities, private wells and a sewer district in the east
Bedford doesn't run its own water or wastewater plant. Public water comes from Manchester Water Works and Pennichuck Water Works, and the state's community profile lists the town's sanitation as a mix of private septic and municipal sewer (Bedford town profile, 2022).
Wells. The town requires a permit for every new and replacement well. A state-certified lab must test the water: bacteria and nitrate results are required, while arsenic, chloride, fluoride, hardness, iron, manganese, pH and sodium are tested for information (Wells & Water Quality). Installing or replacing a well pump takes a pump installer licensed by the state Water Well Board.
PFAS water extensions. Under the 2018 Saint-Gobain consent decree, 148 Bedford properties on Back River Road and South River Road were set to be connected to public water sourced from Manchester Water Works, and four more were to get point-of-entry treatment (Pennichuck presentation, May 2018). On the South River Road and Cedarwood Avenue extension, Saint-Gobain paid for the main, the service connection and decommissioning the well, but not plumbing inside the house (connection FAQ).
Sewer. Town sewer is concentrated on the east side, with the Performance Zone the largest sewered area, and the wastewater goes to Manchester for treatment (staff memo, February 2026). The sewer service area covers dwellings within 100 feet of a public sewer in the district; the code presumes nothing outside the district will be connected, and a home granted a waiver for an alternative septic system must connect once that system needs repair or replacement (Chapter 212). The owner pays to install and connect the building sewer and then maintains it from the building to the property line. An approved pipe layer handles work within 10 feet of the house, a licensed plumber makes the connection and inside piping, the building inspector inspects, and the application is due 30 days before connecting. Roof downspouts and foundation or areaway drains may not be tied into a building sewer (building sewer rules). See drains and sewer lines and sump pumps.
Septic. Every new septic design and waiver goes to the town Health Department for approval before it is sent to the state, and installations need a permit and a town inspection (Septic Systems).
Permits and local rules
Plumbing and gas permits in Bedford
Bedford's code requires a plumbing permit for work that falls under the state's definition of plumbing, and plumbing and gas applications are filed online (Chapter 92).
- How to file
- The town's Online Permitting System takes plumbing, gas, gas fireplace, fuel appliance, generator and electrical applications; building permits are filed in person at the Bedford Safety Complex, and inspections are requested by phone (Online Permitting System).
- Who can do the work
- A plumber or gas fitter licensed by the state's Mechanical Licensing Board (RSA 153:27-a). Bedford limits homeowners to minor work, such as relocating or replacing existing fixtures, in the home they live in, and issues plumbing permits only to license holders unless the Building Department approves otherwise (Chapter 92). For a license check, see OPLC's license lookup page.
- Posted fees
- The town's 2022 fee schedule update lists plumbing at $0.018 per square foot for one- and two-family homes with a $50 minimum, and gas piping with a $50 minimum (Fee Schedule 2022 Update).
- Septic
- Same schedule: $50 to install, $25 for a tank only, and $35 for town plan review before the design goes to NHDES.
Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by May 2027. New England Plumbers is a referral service. We don't pull permits or do plumbing work. The contractor who does the job handles the permit.
Bedford, area by area
Where your house sits decides what's under it
Bedford is mostly single-family: of 8,161 housing units, 6,973 are single-family homes, 142 are in two- to four-unit buildings and 1,046 are in buildings of five or more units (town profile, 2016–2020 census estimates). Whether a home is on a well or public water, and on septic or sewer, depends on the part of town.


The east side and Performance Zone
Where most of Bedford's sewer is. The Performance Zone is the largest sewered area, and its wastewater runs to Manchester.
The Pines Area
Small lots on septic in deep, rapidly percolating sand, one of four areas the 2008 Sewer Master Plan studied for possible sewer.
Back River Road and South River Road
Where the PFAS consent decree brought public water to homes that had relied on private wells. A well kept after connection is limited to non-drinking uses such as irrigation.
Other sewer study areas
North of Boynton Street and east of Route 114, around Sebbins Pond, and Route 101 from Nashua Road to Covenant Way. The town's 2026 memo calls these planning-level studies, not a commitment to build.
Area notes draw on the town's February 2026 water and sewer expansion memo and the South River Road connection FAQ.
FAQ
Bedford plumbing questions
Do I need a permit to drill or replace a well in Bedford?
Yes. Bedford requires a permit for every new and replacement well, and the water has to be tested by a state-certified lab. Bacteria and nitrate results are required; arsenic, hardness, iron, manganese and the other listed tests are for your information.
Can I connect my house to town sewer?
Only if you are inside the sewer district, which serves dwellings within 100 feet of a public sewer there. The town code presumes no property outside the district will be connected, and the sewered area is mostly on the east side of town.
Who is responsible for my sewer lateral?
You are. Bedford's code puts installation, operation, maintenance, repair and replacement of the building sewer on the property owner, from the building to the property line. Work within 10 feet of the house is done by an approved pipe layer, and the connection and inside piping by a licensed plumber.
We were switched to public water because of PFAS. Can we keep the old well?
In the South River Road project, a kept well had to be plumbed only to outside spigots or an irrigation system, completely separate from the indoor drinking water plumbing, with a non-potable warning sign at each spigot. Reconnecting it later for drinking water meant coordinating with the water system to avoid a cross-connection.
Is there a charge to use New England Plumbers?
No. The call and the referral are free to homeowners. Any estimate and any work are agreed directly between you and the contractor.