New England Plumbers home

Home › New Hampshire › Bedford

Plumbers in Bedford, NH

A Bedford home may get its water from Manchester Water Works, Pennichuck or its own well, and town sewer reaches only a district on the east side that drains to Manchester. Call (978) 788-2810 or send the form. We'll review your request and help you with the next step.

  • Free for homeowners
  • Credentials checked before referral
  • Wells, septic and town sewer

Ask About Plumbing Service in Your Area

Tell us about the job. We'll review it and help you with the next step.

Your details go to New England Plumbers only, so we can reply. We would share them with a contractor only if one becomes available for your area and you agree. Privacy

How your request is handled: it comes to New England Plumbers. We review it and reply by the next business day. No participating plumber covers this area yet, so we can't promise a contractor introduction. If water is actively leaking, call a licensed plumber directly. If you smell gas, leave the house and call 911 once you're outside.

Water, wells, sewer and septic

Two water utilities, private wells and a sewer district in the east

Bedford doesn't run its own water or wastewater plant. Public water comes from Manchester Water Works and Pennichuck Water Works, and the state's community profile lists the town's sanitation as a mix of private septic and municipal sewer (Bedford town profile, 2022).

Wells. The town requires a permit for every new and replacement well. A state-certified lab must test the water: bacteria and nitrate results are required, while arsenic, chloride, fluoride, hardness, iron, manganese, pH and sodium are tested for information (Wells & Water Quality). Installing or replacing a well pump takes a pump installer licensed by the state Water Well Board.

PFAS water extensions. Under the 2018 Saint-Gobain consent decree, 148 Bedford properties on Back River Road and South River Road were set to be connected to public water sourced from Manchester Water Works, and four more were to get point-of-entry treatment (Pennichuck presentation, May 2018). On the South River Road and Cedarwood Avenue extension, Saint-Gobain paid for the main, the service connection and decommissioning the well, but not plumbing inside the house (connection FAQ).

Sewer. Town sewer is concentrated on the east side, with the Performance Zone the largest sewered area, and the wastewater goes to Manchester for treatment (staff memo, February 2026). The sewer service area covers dwellings within 100 feet of a public sewer in the district; the code presumes nothing outside the district will be connected, and a home granted a waiver for an alternative septic system must connect once that system needs repair or replacement (Chapter 212). The owner pays to install and connect the building sewer and then maintains it from the building to the property line. An approved pipe layer handles work within 10 feet of the house, a licensed plumber makes the connection and inside piping, the building inspector inspects, and the application is due 30 days before connecting. Roof downspouts and foundation or areaway drains may not be tied into a building sewer (building sewer rules). See drains and sewer lines and sump pumps.

Septic. Every new septic design and waiver goes to the town Health Department for approval before it is sent to the state, and installations need a permit and a town inspection (Septic Systems).

Permits and local rules

Plumbing and gas permits in Bedford

Bedford's code requires a plumbing permit for work that falls under the state's definition of plumbing, and plumbing and gas applications are filed online (Chapter 92).

How to file
The town's Online Permitting System takes plumbing, gas, gas fireplace, fuel appliance, generator and electrical applications; building permits are filed in person at the Bedford Safety Complex, and inspections are requested by phone (Online Permitting System).
Who can do the work
A plumber or gas fitter licensed by the state's Mechanical Licensing Board (RSA 153:27-a). Bedford limits homeowners to minor work, such as relocating or replacing existing fixtures, in the home they live in, and issues plumbing permits only to license holders unless the Building Department approves otherwise (Chapter 92). For a license check, see OPLC's license lookup page.
Posted fees
The town's 2022 fee schedule update lists plumbing at $0.018 per square foot for one- and two-family homes with a $50 minimum, and gas piping with a $50 minimum (Fee Schedule 2022 Update).
Septic
Same schedule: $50 to install, $25 for a tank only, and $35 for town plan review before the design goes to NHDES.

Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by May 2027. New England Plumbers is a referral service. We don't pull permits or do plumbing work. The contractor who does the job handles the permit.

Bedford, area by area

Where your house sits decides what's under it

Bedford is mostly single-family: of 8,161 housing units, 6,973 are single-family homes, 142 are in two- to four-unit buildings and 1,046 are in buildings of five or more units (town profile, 2016–2020 census estimates). Whether a home is on a well or public water, and on septic or sewer, depends on the part of town.

Brick Greek Revival house with a tall columned porch and black shutters on a lawn
White hip-roof house with red shutters under orange autumn maples on a broad lawn

The east side and Performance Zone

Where most of Bedford's sewer is. The Performance Zone is the largest sewered area, and its wastewater runs to Manchester.

The Pines Area

Small lots on septic in deep, rapidly percolating sand, one of four areas the 2008 Sewer Master Plan studied for possible sewer.

Back River Road and South River Road

Where the PFAS consent decree brought public water to homes that had relied on private wells. A well kept after connection is limited to non-drinking uses such as irrigation.

Other sewer study areas

North of Boynton Street and east of Route 114, around Sebbins Pond, and Route 101 from Nashua Road to Covenant Way. The town's 2026 memo calls these planning-level studies, not a commitment to build.

Call to talk it through

(978) 788-2810

Free for homeowners.

Send a Request

Area notes draw on the town's February 2026 water and sewer expansion memo and the South River Road connection FAQ.

FAQ

Bedford plumbing questions

Do I need a permit to drill or replace a well in Bedford?

Yes. Bedford requires a permit for every new and replacement well, and the water has to be tested by a state-certified lab. Bacteria and nitrate results are required; arsenic, hardness, iron, manganese and the other listed tests are for your information.

Can I connect my house to town sewer?

Only if you are inside the sewer district, which serves dwellings within 100 feet of a public sewer there. The town code presumes no property outside the district will be connected, and the sewered area is mostly on the east side of town.

Who is responsible for my sewer lateral?

You are. Bedford's code puts installation, operation, maintenance, repair and replacement of the building sewer on the property owner, from the building to the property line. Work within 10 feet of the house is done by an approved pipe layer, and the connection and inside piping by a licensed plumber.

We were switched to public water because of PFAS. Can we keep the old well?

In the South River Road project, a kept well had to be plumbed only to outside spigots or an irrigation system, completely separate from the indoor drinking water plumbing, with a non-potable warning sign at each spigot. Reconnecting it later for drinking water meant coordinating with the water system to avoid a cross-connection.

Is there a charge to use New England Plumbers?

No. The call and the referral are free to homeowners. Any estimate and any work are agreed directly between you and the contractor.

Nearby

Other towns in our Queen City area

See all New Hampshire service areas →

Plumbing job in Bedford? Tell us what you need.

Call (978) 788-2810
Call NowSend a Request